Perfume is quoted against a specification, not a category. This page lists the decisions a perfume project has to fix before a price means anything, shows how quantity is counted per SKU in Vietnam, and gives you a worked example, a draft you can build in the browser, and a comparison sheet to copy.
Settle these before you ask for a price not a form to fill in
Perfume is quoted against a specification, not against a category. Two buyers both asking for “a 50 ml EDP” can be quoted three times apart, because one brief fixes the bottle, pump, cap and outer box and the other leaves all four open. The list below is what closes those gaps.
Nothing here asks for your name, phone number or email. The draft this page produces contains product requirements only.
| What has to be fixed | Why the quotation depends on it |
|---|---|
| Target sales market | Access rules and label content differ by market. One formula going to the EU and to the US is not one set of documents. |
| Number of scents | Each scent is its own SKU, with its own minimum. |
| Quantity per scent | A project total does not mean every SKU reaches its own minimum. |
| Capacity in ml | A second fill volume is a second SKU, and may need a different bottle and pump. |
| Who supplies bottle, pump, cap and box | Buyer-supplied components carry their own minimum and lead time, and the factory can only re-check what it can hold in its hand. |
| Whether you want a sample first | Sampling is costed and scheduled separately from bulk production. |
| Which documents you need to see | Document scope depends on the product and the destination, and is confirmed per project. |
| What is already fixed | A bottle reference, artwork and a fragrance direction remove options, and a price against fixed inputs is a firmer price. |
Quantity is counted per SKU not per order
This is the same rule the category pages use: the minimum applies per SKU. The published perfume minimum is 2,000 units per SKU. Two scents at 1,000 units each make a project total of 2,000, but each line is still 1,000 — a total that adds up does not mean every line does.
A 30 ml and a 50 ml are two SKUs, not one. Changing the fill volume on the same scent can change the bottle and the pump, so it is costed as its own line.
Worked example purchasing example
The example below shows how the arithmetic works. It does not mean this combination would be accepted.
| Line | Scent | Capacity | Quantity |
|---|---|---|---|
| SKU 1 | Scent A | 50 ml | 1,000 units |
| SKU 2 | Scent B | 50 ml | 1,000 units |
| Project total | — | — | 2,000 units |
Each line still reads 1,000 units. The perfume minimum published on this site is 2,000 units per SKU, so two lines written this way do not reach it — which is exactly why the applicable minimum for each line should be written into the quotation. A total of 2,000 is not 2,000 per scent.
Build your draft in the browser only
Fill it in and you get one block of text to copy and paste into an email or a message. Several answers can stay “not decided” — that is useful information too, because it tells the supplier which open item is blocking a price.
What you type here does not leave this browser: no server request, no local storage, no URL parameters, no analytics. Close the tab and it is gone.
Enter a whole number per line. Leaving it empty counts as not decided.
Quote comparison sheet standardise before comparing
Two quotations can carry the same unit price and cover different things. Fill this sheet against one specification first, then compare the numbers; otherwise you are comparing two different products. The price columns are left for the suppliers’ own figures — no amount is published on this page.
| Cost line | Supplier A | Supplier B | Notes |
|---|---|---|---|
| Fragrance compound | Concentration and dosage per unit | ||
| Bottle | Whether the mould cost is included | ||
| Pump and cap | Whether assembly is included | ||
| Outer box | Whether print and cutting die are separate lines | ||
| Sampling / tooling | One-off charge, and whether it is refundable | ||
| Documents | What is included and what is charged separately | ||
| Delivery terms | The trade term and the named place | ||
| Quantity the quote applies to | Which quantity tier it is based on |
Perfume bottle, pump and cap confirmation example
Packaging does not end when the style is chosen. What the buyer specifies, what the factory re-checks and what can move the price are three different lines; discussed together, the quotation keeps changing.
| What the buyer must specify | What the factory re-checks | What can change the quotation |
|---|---|---|
| Fill volume and bottle capacity | Whether the declared capacity reaches the stated fill with the chosen pump, and whether the bottle neck matches the pump collar | A different fill volume usually means a different bottle, and a different bottle has its own minimum |
| Bottle material, weight and colour | Glass or plastic; the colour reference; whether the finish is a coating, a metallisation or the material itself | Custom colour or coating is produced in batches, so it carries its own minimum and setup |
| Pump output and spray pattern | Dosage per actuation against the formula’s viscosity and alcohol content; leakage and actuation force | A non-stock dosage or a non-standard neck size can require tooling |
| Cap type, finish and decoration | Fit and removal force against the collar; whether the decoration survives assembly | A new mould or a new decoration method adds tooling and a minimum |
| Outer box structure and board | Board grade, print process, barcode area, and the mandatory label content for the destination market | Artwork changes are charged per colour per print run; a new structure needs a new cutting die |
| Label and mandatory text | Whether the label carries what the destination market requires, including allergen declaration | Each additional language version is a separate print run |
| Packing and export carton | Units per carton, carton strength, and how the product is classified for transport | The transport mode decides the packing, and packing changes the unit cost |
This is the confirmation order for one example component set, not a photograph of a product. No product image is shown on this page: the perfume photography available here carries client branding, and the publishable scope is pending the owner’s confirmation. Every row below has to resolve to a specific value before a price means anything.
Where these answers live read the full page
- MOQ and sampling — the minimum per category, sampling cost and timing, and what the bulk date is set against.
- Cooperation routes — the difference between OEM, ODM and white label from existing stock.
- Documents we issue — what the factory provides and what the buyer has to provide.
- Perfume manufacturing — how the scent direction, bottle and target market move forward.
