Home/Process

Process

Seven process steps from enquiry to shipment, one contact. Day 0 and days 1–3 each carry a defined hand-off; bulk lead time is confirmed against your sealed sample and packaging readiness, then written into the order — no fixed day count, and no "approximately".

Seven steps 7

DAY 0

Brief & feasibility

Formula direction, pack format and target market reviewed. If the route is wrong we say so in the first email, not the third meeting.

DAY 1–3

Quote & sampling plan

Quotation issued, and the sampling plan agreed: stock samples or a custom sample. Bottle moulds and tooling costs are itemised in the quote.

SAMPLING

Stock and custom samples

1–3 stock pieces free, dispatched in 3–7 days. Custom samples are made from the confirmed formula, 7–10 working days from formula and bottle confirmation; stability and compatibility run in-house before they ship.

ON SIGN-OFF

Production window

Line slot confirmed before you commit payment. Lead time is confirmed against your sealed sample and packaging readiness, then written into the order. Every batch carries a traceable record.

SCHEDULED

Production & batch records

Run in the booked window; filling takes place in ISO Class 8 clean zones, and the formula and packaging used for each batch are recorded.

SCHEDULED

QC and release

Release testing per category; stability and compatibility run in the in-house lab.

SHIPPING

Shipping documents

Export documents are prepared to the target market requirement; the exact list is confirmed with the quote.

Steps and hand-offs

Day 0: brief and feasibility. Days 1–3: quotation and the sampling plan — stock samples or a custom sample. Those two are actions and deliverables, not day-count promises.

Bulk lead time is confirmed against your sealed sample and packaging readiness, then written into the order. The clock starts the day the sample is signed back — not the day you order, and not the day the deposit lands.

Repeat production, QC and shipping do not get fixed day counts either — timing depends on formula complexity, bottle tooling and line availability, and only counts once the schedule is confirmed. Writing "about 15 days" reads well and becomes a dispute.

Stock samples: 1–3 pieces free, shipped in 3–7 days. That one is a commitment.

The number of free rounds, who pays international shipping, and the MOQ band for each of the 15 categories are set out in full on MOQ & sampling.

What each step hands you

Day 0 gives you a feasibility call — including "no" as an answer. Days 1–3 give you a quotation and a sampling plan: stock samples, or a custom sample run against the formula.

Sampling gives you a sample made to the agreed formula, 7–10 working days from formula and bottle confirmation; capacity, closure and liner are fixed at this step.

After sign-off the line slot is booked before production runs, and every batch carries a traceable record. Shipping documents are prepared to the target market requirement, with the exact list confirmed alongside the quote.

Where a wrong route gets stopped

Day 0. It is the only step designed to say no first: if your volume, category or target market does not fit our lines, we say so in the first email instead of the third meeting.

That call rests on line capability and certificate scope, not on negotiation. In practice a route gets stopped because the category does not match the lines, the volume sits below the MOQ, or the target market requires something we cannot cover.

Quality control: what gets checked at each step

Quality control is not a single gate at the end. Each of the seven steps closes one check, in this order:

Day 0 · feasibility: wrong route, a category the lines do not run, or a volume below the threshold — we say no in the first email. The output of this step is a yes-or-no, not a price.

Sampling · stability and compatibility: both run in the in-house lab before the sample ships; we do not send out a sample that has not finished those tests. Custom sampling is quoted at 7–10 working days from confirmation of formula and bottle.

Slot booking · record opened: the line slot is fixed before you commit payment, and the formula and packaging for that batch are recorded before production starts.

Production · batch record: run in the booked window against the recorded formula; filling happens in ISO Class 8 clean zones and the batch record travels with the batch, tracing materials and operations.

Release · testing per category: release testing is done per category and the basis for the call goes into the batch record. Nothing releases without it.

Shipping · documents: export documents are prepared to the target market requirement, with the list confirmed at quotation rather than assembled at the end.

If you want to see the batch record for a specific lot, that can be arranged during evaluation.

A walk through the plant · 48 seconds

Shot on site and cut in production order, in eight segments: aerial of the site, gowning, laboratory, instrument work, emulsifying vessels and the operating platform (two shots), filling, packing. The joins are cuts, not a time-lapse; each segment is a real place on the floor.

No music, no voiceover, and no text added to the frame. For stills, the factory page has six site photographs you can check against the film.

48 s · 3.9 MB · 1280×720 · no autoplay, downloads only when you press play
OEM / ODM

Let’s discuss your product

Send the brief — we can tell you on day 0 whether the route works.

Three lines, and the first reply can answer you
  1. CategoryWhich category, or simply "like that product of yours" — more useful than a formula name
  2. VolumeRoughly how many units or kilograms, per SKU
  3. MarketThe destination decides access and labelling — one formula going to the EU and to the US is not one set of documents

You get three answers back: whether it is feasible, the MOQ, and how sampling works. If it does not fit our lines, we say so in the first email instead of the third meeting.

Email usWhatsApp